Yunnan's reorganization of "two high and one capital" step by step

The coking enterprises below 50,000 tons have all been shut down, and the scale of 200,000 tons, 400,000 tons and 600,000 tons will be phased out in three years

On June 15, the reporter learned from the Economic Commission of Yunnan Province that the province has been effective in rectifying small coking plants since 2003. As of now, the small coking plant below 50,000 tons in Yunnan Province has been completely dismantled. This alone will enable the province's coal and coking industries to reduce energy consumption by 200,000 tons of standard coal this year.
Yunnan is one of the major coke provinces. According to Shang Wei, Director of the Economic Operation Department of the Yunnan Economic Commission, for a long time, the coal-coal industry in Yunnan Province has problems such as high energy consumption, waste of resources, and serious environmental pollution. At the most, there are nearly 100 small coking plants in Yunnan Province. In 2003, Yunnan Province proposed to target the energy conservation and emission reduction of coal and coking industries and to dismantle all small coking plants of 50,000 tons or less. In Qujing alone, the relevant authorities have shut down 50,000 tons of small machine coke production capacity of nearly 7.2 million tons.
Shang Wei said that in accordance with the principle of equal elimination and total control, the total coke production in Yunnan this year will be controlled at 11.2 million tons, 1.1 million tons less than the previous year. At present, environmental protection departments at all levels have established a dynamic monitoring system for pollutant emissions from coke enterprises, and focus on tracking and monitoring of coke production enterprises. The coking plant that does not support the environmental protection and comprehensive utilization facilities and exceeds the standards for pollutant discharge will increase penalties in accordance with relevant regulations and correct them within a time limit. After the rectification is still not up to the standard is firmly closed. In accordance with the principle of equal replacement for new coke projects, project approval, land use approval, and environmental protection approval shall be checked one by one. Encourage large enterprises to adopt new technologies for energy saving and emission reduction and environmental protection, transform existing coke companies, increase production technology levels and product quality, increase centralized processing and deep processing of coal tar, crude light benzene, reduce energy consumption, and improve the environment.
Shang Wei explained that the equal elimination is not all shut down. The government encourages the establishment of a coking plant with a coke oven of 4.3 meters or more and an annual output of 600,000 tons or more in the form of joint stocks or joint ventures. Existing companies can switch to coal washing.
Shang Wei said that according to the "Entry Conditions for Coking Industry" promulgated by the National Development and Reform Commission, Yunnan Province will phase out the small machine coke with a capacity of 200,000 tons this year and eliminate the small machine coke with a capacity of 200,000 to 400,000 tons next year. By the end of 2009, Yunnan Province will shut down all coking companies that do not meet the national industrial policy and have a production capacity of 600,000 tons or less. At the same time, it has guided the new batch of coking projects that meet the national industrial policy and have a capacity of over 1 million tons.

Commercial Soup Stove

Commercial Soup Stove,Stove Top Potato Soup,Chicken Taco Soup Stove Top,Stove Top Chicken Noodle Soup

Guangdong Puda Electrical Appliance Co., Ltd. , https://www.elecapoka.com