Spring Hangers And Supports,Piping Supports,Fixed Pipe Supports,Spring Hanger Simcan Industrial Equipment Co.,Ltd. , https://www.simcanindustry.com
Glb120-27 Progressive Cavity Pump for Cmb Coal Methane for Sale
**Product Specifications:**
- **Model No.:** GLB120-27
- **Head Lift:** 1200 - 1600 ft
- **Sucker Rod:** 1"
- **Applicable Tubing:** 73mm
- **Daily Flow Displacement:** 10 - 25 m³/day
- **Rod Rate:** 60 - 150 RPM
- **Stator Upper Thread:** 3-1/2"
- **Stator Lower Thread:** 2 7/8"
- **Rotor Connection Thread:** 1-3/8"
- **Trademark:** Baofeng Brand
- **Transport Package:** Standard Packaging
- **Specification:** API, ISO, CE
- **Origin:** Shandong, China
---
**Coalbed Methane (CBM) Specialized Downhole Screw Pump**
This progressive cavity pump is specifically designed for coalbed methane extraction. It is ideal for high-rank CBM reservoirs where long-term performance and maximum production are essential. The GLB120-27 model has been optimized for deep well applications, ensuring efficient operation under various geological conditions.
**Key Features of the Screw Pump System:**
The screw pump system consists of the following components:
- **Surface Drive Device:** Provides power to the downhole pump.
- **Downhole Screw Pump:** Efficiently extracts fluids from the well.
- **Electrical Control Panel:** Monitors and regulates the pump’s operation.
- **Matching Tools:** Ensure proper installation and alignment.
Screw pumps have become a popular choice in oil fields around the world due to their efficiency, reliability, and cost-effectiveness. They are increasingly used as an alternative to traditional pumping systems, especially in shallow and medium-depth wells.
**Applicable Conditions:**
This pump is suitable for a wide range of oil types, including:
- Low viscosity crude oil
- Heavy oil
- High wax oil
- High sand oil
- High gas oil
- High freezing point oil
It offers numerous advantages such as low initial investment, high oil production efficiency, low energy consumption, simple structure, and ease of operation, installation, and maintenance.
**Advantages:**
- Cost-effective solution for oil and gas extraction
- High efficiency with minimal energy use
- Easy to maintain and operate
- Suitable for challenging well conditions
---
**Images of the Product:**
[Image 1: GLB120-27 Progressive Cavity Pump](http://i.bosscdn.com/uploads/21/b9/fb/09fdec35d727c30fa657490991.jpg)
[Image 2: Detailed View of the Pump](http://i.bosscdn.com/uploads/55/d4/0d/3703e83b6ceb7fe912f5f197ab.jpg)
[Image 3: Pump Components](http://i.bosscdn.com/uploads/45/5a/70/23fa3c3d7cbe1d729f9d0b33b1.jpg)
[Image 4: Installation Example](http://i.bosscdn.com/uploads/27/80/1b/7cc50510b7a1eb8a295fc224fe.jpg)
[Image 5: Working Environment](http://i.bosscdn.com/uploads/05/a2/36/8d5ec848c3ad2bdc3b971f07e7.jpg)
---
**Contact Information:**
For more information or to place an order, please contact us directly:
- **Phone:** +86 0536 8663518
- **Website:** [www.wfbaofeng.com](http://www.wfbaofeng.com)
Whether you're looking for reliable equipment for your coalbed methane project or want to learn more about our products, we’re here to help. Don’t hesitate to reach out for a detailed quote or technical support.